Nexus Double-Sided Portable Whiteboard Tablet, 27.88" x 27.88", White Surface, Satin Aluminum Frame

Product Number: ESS-GHENEX101TM
$423.91
This double-sided high-pressure laminate whiteboard is lightweight and portable weighing only 4 lbs. The compact size makes the tablet simple to move and easy to store. Included is a black marker and eraser/marker holder which snaps in between the handle and board frame. Display options are flexible and expandable with board hangers for mobile units, X-Pegs for walls, and X-Hangers for panel systems. Alternative to traditional chart pads.
Quantity

The Nexus Tablet is a double-sided high-pressure laminate whiteboard. It is lightweight and portable weighing only 4 lbs. The compact size makes the tablet simple to move and easy to store. Included is a black marker and eraser/marker holder which snaps in between the handle and board frame. Display options are flexible and expandable with board hangers for mobile units, X-Pegs for walls, and X-Hangers for panel systems. Alternative to traditional chart pads.
Ghent
ESS-GHENEX101TM

Data sheet

Package Includes
Black Marker
Package Includes
Marker Bin
Mounting Details
Nexus Easel Whiteboard Inserts
Global Product Type
Dry Erase Boards - Easel/Mobile
Product Biodegradability Indicator
N
Product Compostability Indicator
N
Pre-Consumer Recycled Content Percent
0%
Post-Consumer Recycled Content Percent
0%
Total Recycled Content Percent
0%
Unit Of Measure
EA
Frame Material
Aluminum
Board Surface Type(s)
Dry Erase
Magnetic Board Surface
No
Surface Material
Laminate
Surface Color
White
Dedicated Projection Screen
No
Flipchart Mounting System
No
Frame Color/Finish
Satin
Board Width
27.88"
Board Height
27.88"
Preformatted Board Surface
No
Supports Custom Surface Formatting
No
Board Depth
1"
Accessory/Component Details
Ghent Nexus Easel Whiteboards

No customer reviews for the moment.

Related products