Gridded Magnetic Steel Dry Erase Project Planning Board, w/Accs, 1" x 2" Cell, 72" x 48", White Surface, Satin Aluminum Frame

Product Number: ESS-BVCMA2792830A
$1,148.32
Organization is vital for the success of every business or enterprise. Planning boards are excellent tools that allow you to keep planning and tracking on time. Keeping important tasks on display, organizing work-groups or just planning ahead is practical and easy. Pale gray grid lines help ensure easy alignment of text and magnetic accessories. Magnetic lacquered steel dry erase surface is suitable for frequent use and allows you to post notes and messages as well as write. Sturdy aluminum frame features a sliding pen tray and an easy four-corner mounting system. Includes mounting kit.
Quantity

Organization is vital for the success of every business or enterprise. Planning boards are excellent tools that allow you to keep planning and tracking on time. Keeping important tasks on display, organizing work-groups or just planning ahead is practical and easy. Pale gray grid lines help ensure easy alignment of text and magnetic accessories. Magnetic lacquered steel dry erase surface is suitable for frequent use and allows you to post notes and messages as well as write. Sturdy aluminum frame features a sliding pen tray and an easy four-corner mounting system. Includes mounting kit.
ESS-BVCMA2792830A

Data sheet

Package Includes
Mounting Kit
Package Includes
(10) Card Holders
Package Includes
(1) Set of Magnetic Shapes
Package Includes
Accessory Tray
Preformatted Surface Details
Project Planning & Tracking Spreadsheet (1" x 2" Cells)
Mounting Details
Four-Corner Wall-Mount System (Included)
Global Product Type
Preformatted Dry Erase Boards
Pre-Consumer Recycled Content Percent
0%
Post-Consumer Recycled Content Percent
0%
Total Recycled Content Percent
0%
Unit Of Measure
EA
Frame Material
Aluminum
Board Surface Type(s)
Dry Erase
Magnetic Board Surface
Yes
Surface Material
Gold Ultra™ Lacquered Steel
Surface Color
White
Dedicated Projection Screen
No
Flipchart Mounting System
No
Frame Color/Finish
Satin
Board Width
72"
Board Height
48"
Preformatted Board Surface
Yes
Supports Custom Surface Formatting
No
Board Depth
1.38"
Surface Use Rating
Heavy/Frequent Use
Grid Columns
35
Grid Rows
47
Compliance Standards
ISO 9001-2008

No customer reviews for the moment.

Related products