Dry Erase Board with Aluminum Frame, 36" x 24", White Surface, Satin Aluminum Frame

Product Number: ESS-MEA85356
$79.23
Never forget another meeting with this versatile dry-erase board. Dry-erase surface makes writing less of a chore, so you can jot down important reminders and appointments. This durable board hangs horizontally and vertically and is easy to install with the included easy pass through mounting hardware.
Quantity

Never forget another meeting with this versatile dry-erase board. The dry-erase melamine surface makes writing less of a chore and cleans up fast. Use the board to jot down important reminders, or use it to map out a new business strategy. This durable board hangs horizontally and vertically, and is easy to install with the included mounting hardware. The aluminum finish frame blends into any occasional-use small commercial or home office.
Mead®
ESS-MEA85356

Data sheet

Package Includes
Mounting Kit
Mounting Details
Pass-Through Wall-Mount Hardware (Included)
Global Product Type
Dry Erase Boards - Wall-Mount
Pre-Consumer Recycled Content Percent
0%
Post-Consumer Recycled Content Percent
0%
Total Recycled Content Percent
0%
Unit Of Measure
EA
Frame Material
Aluminum
Board Surface Type(s)
Dry Erase
Magnetic Board Surface
No
Surface Material
Melamine
Surface Color
White
Dedicated Projection Screen
No
Flipchart Mounting System
No
Frame Color/Finish
Satin
Board Width
36"
Board Height
24"
Preformatted Board Surface
No
Supports Custom Surface Formatting
No

No customer reviews for the moment.

Related products