Prestige 2 DuraMax Magnetic Porcelain, 96" x 48", White Surface, Graphite Gray Fiberboard/Plastic Frame

Product Number: ESS-QRTP558GP2
$1,641.73
Durable whiteboard's magnetic, porcelain surface will not ghost, stain, scratch or dent. Includes four dry-erase markers, two magnets, accessory tray and mounting kit.
Quantity

Prestige 2 DuraMax porcelain board features our most durable writing surface. Exceptionally resilient and smooth, the porcelain surface will not ghost, stain, scratch or dent over time, even after years of heavy use. The surface of this whiteboard is also magnetic so that it can double as a magnetic bulletin board. With a stylish frame and attached marker tray, this top of the line board is a useful addition to any office space. Hang board quickly and easily on any wall using the included pass-through mounting hardware. Quartet Prestige 2 Connects™ accessories, sold separately, are also compatible with the Prestige 2 Connects™ board to increase ease-of-use and offer additional functionality. Minimal cleaning of board surface is recommended.
Quartet®
ESS-QRTP558GP2

Data sheet

Package Includes
Mounting Kit
Package Includes
(4) Dry Erase Markers
Green Information
Certified for material content and sustainable manufacturing processes.
Mounting Details
Pass-Through Wall-Mount Hardware (Included)
Global Product Type
Dry Erase Boards - Wall-Mount
Pre-Consumer Recycled Content Percent
0%
Post-Consumer Recycled Content Percent
0%
Total Recycled Content Percent
0%
Unit Of Measure
EA
Frame Material
Medium Density Fiberboard (MDF)
Frame Material
Plastic
Board Surface Type(s)
Dry Erase
Magnetic Board Surface
Yes
Surface Material
DuraMax Porcelain
Surface Color
White
Dedicated Projection Screen
No
Flipchart Mounting System
No
Frame Color/Finish
Graphite Gray
Board Width
96"
Board Height
48"
Preformatted Board Surface
No
Supports Custom Surface Formatting
No
Surface Use Rating
Heavy/Frequent Use
Compliance Standards
Cradle to Cradle Certified™ Silver

No customer reviews for the moment.

Related products