Classic Series Porcelain Magnetic Dry Erase Board, 72" x 48", White Surface, Black Aluminum Frame

Product Number: ESS-QRT2547B
$1,116.66
Durable, ultra-smooth board with DuraMax porcelain surface will not scratch, dent, stain or ghost. Delivers superior performance in heavy-use collaborative environments. Magnetic surface.
Quantity

Durable, ultra-smooth board with DuraMax porcelain surface will not scratch, dent, stain or ghost. Delivers superior performance when collaboration is needed in high-profile, heavy-use office environments. Magnetic surface doubles as bulletin board. Easy-to-clean writing surface requires minimal use of Quartet cleaning solutions. Unique mounting system, quickly and easily secures board to wall. Stylish frame complements high-profile interiors. Includes four Quartet dry-erase markers.
Quartet®
ESS-QRT2547B

Data sheet

Package Includes
(4) Dry Erase Markers
Package Includes
(1) Set of Mounting Hardware
Mounting Details
Z-Bracket Wall-Mount Hardware (Included)
Global Product Type
Dry Erase Boards - Wall-Mount
Pre-Consumer Recycled Content Percent
0%
Post-Consumer Recycled Content Percent
0%
Total Recycled Content Percent
0%
Unit Of Measure
EA
Frame Material
Aluminum
Board Surface Type(s)
Dry Erase
Magnetic Board Surface
Yes
Surface Material
DuraMax Porcelain
Surface Color
White
Dedicated Projection Screen
No
Flipchart Mounting System
No
Frame Color/Finish
Black
Board Width
72"
Board Height
48"
Preformatted Board Surface
No
Supports Custom Surface Formatting
No
Surface Use Rating
Heavy/Frequent Use
Compliance Standards
Cradle to Cradle Certified™ Silver

No customer reviews for the moment.

Related products