Gridded Magnetic Porcelain Dry Erase Project Planning Board, 1" x 2" Cell, 72" x 48", White Surface, Satin Aluminum Frame

Product Number: ESS-BVCCR1230830
$1,199.71
Pale gray grid lines simplify planning and allow easy alignment of magnetic accessories. The magnetic porcelain baked enamel surface resists staining, ghosting and scratching and is suitable for extensive use. Sturdy aluminum frame features an easy four-corner mounting system. Includes accessory tray and mounting kit.
Quantity

Organization is vital for the success of every business or enterprise. MasterVision® Dry-erase Planning Boards are excellent tools that allow you to plan and track projects. Keeping important tasks on display, organizing work-groups or just planning ahead is practical and easy with the 1" x 2" gridded surface. The porcelain magnetic dry-erase surface resists staining, ghosting and scratching to keep its bright, high-quality appearance through years of extensive use. The aluminum frame includes a four corner mounting system that makes installation a breeze. The contemporary sliding aluminum pen tray offers a convenient way to keep your writing utensils within quick reach.
ESS-BVCCR1230830

Data sheet

Package Includes
Mounting Kit
Package Includes
Accessory Tray/Rail
Preformatted Surface Details
Project Planning & Tracking Spreadsheet (1" x 2" Cells)
Mounting Details
Four-Corner Wall-Mount System (Included)
Global Product Type
Preformatted Dry Erase Boards
Pre-Consumer Recycled Content Percent
0%
Post-Consumer Recycled Content Percent
0%
Total Recycled Content Percent
0%
Unit Of Measure
EA
Frame Material
Aluminum
Board Surface Type(s)
Dry Erase
Magnetic Board Surface
Yes
Surface Material
Porcelain
Surface Color
White
Dedicated Projection Screen
No
Flipchart Mounting System
No
Frame Color/Finish
Satin
Board Width
72"
Board Height
48"
Preformatted Board Surface
Yes
Supports Custom Surface Formatting
No
Grid Columns
23
Grid Rows
45
Compliance Standards
ISO 9001-2008

No customer reviews for the moment.

Related products