Porcelain Value Dry Erase Board, 36" x 48", White Surface, Satin Aluminum Frame

Product Number: ESS-BVCCR0801170MV
$333.28
The magnetic porcelain, baked enamel Platinum Plus™ surface resists staining, ghosting and scratching and is suitable for extensive use. Sturdy aluminum frame features the four-corner system, enabling easy vertical and horizontal mounting.
Quantity

The Maya Porcelain Magnetic Dry-erase Board features a durable whiteboard surface that resists staining, ghosting and scratching to keep its bright, high-quality appearance through years of extensive use. Magnetic surface allows you to instantly post messages or attach your magnetic accessories. The professional Maya aluminum frame includes a four-corner mounting system that can be positioned either vertically or horizontally to provide versatility when reconfiguring an office or where wall space is limited. The adjustable aluminum pen tray offers a convenient way to keep your writing utensils within quick reach. This dry-erase board is perfect for classrooms, offices, training environments, meeting rooms and more.
ESS-BVCCR0801170MV

Data sheet

Package Includes
Instructions
Package Includes
Aluminum Tray
Package Includes
(4) Corner Mounting Kit
Mounting Details
Four-Corner Horizontal/Vertical Wall-Mount System (Included)
Global Product Type
Dry Erase Boards - Wall-Mount
Pre-Consumer Recycled Content Percent
0%
Post-Consumer Recycled Content Percent
0%
Total Recycled Content Percent
0%
Unit Of Measure
EA
Frame Material
Aluminum
Board Surface Type(s)
Dry Erase
Magnetic Board Surface
Yes
Surface Material
Porcelain
Surface Color
White
Dedicated Projection Screen
No
Flipchart Mounting System
No
Frame Color/Finish
Satin
Board Width
36"
Board Height
48"
Preformatted Board Surface
No
Supports Custom Surface Formatting
No
Board Depth
1"
Compliance Standards
ISO 9001-2008

No customer reviews for the moment.

Related products